Case Study: Reducing Lead Times by 40% for European EV Battery Fasteners

How Taily Metal leveraged multi-station cold heading to deliver 500,000 custom EV battery bolts with ±0.02mm precision in just 15 days.

2026-08-19 6 min read

The Challenge: High Volume, Tight Deadline

A leading European Tier-1 automotive supplier was facing a critical delay. They needed 500,000 units of custom Grade 10.9 high-strength bolts with a specific Dacromet finish. Their regular European supplier quoted a 6-week lead time, which would have stalled their EV battery assembly line.

The Taily Metal Solution

Taily Metal's engineering team analyzed the drawing and immediately recommended a high-speed multi-station cold heading process. Unlike CNC machining, which is slow and wasteful, our cold heading machines can produce up to 150 pieces per minute with near-zero material waste.

Tungsten Carbide Tooling

To maintain the ±0.02mm tolerance over a half-million piece run, we used custom tungsten carbide dies. This ensured that the first and the 500,000th bolt were dimensionally identical.

The Result: 15-Day Delivery

We completed the entire production run and QC testing in 12 days. Including air freight, the parts reached the client's facility in 15 days—a 40% reduction in lead time compared to their previous supplier.

Explore Relevant Solutions

View our complete range of Cold Headed Fasteners

View Product Details

Need Fastener Help?

Our engineers reply within 24 hours with material recommendations and quotations.

Request a Quote
TTaily Metal

ISO 9001 certified manufacturer specializing in custom cold heading, CNC machining, and stamping solutions since 2001.

Contact

Dongguan, Guangdong, China 0086-0769-83481151 [email protected]
© 2026 Dongguan Taily Metal Co., Ltd. All rights reserved.ISO 9001:2015 Certified